20' container | 30' container | 40' container | |
stores power | 600KWh | 1200KWh | 2000KWh |
PCS power | 250/500/600KW | 500/630KW | 1000/1200KW |
Live view
System composition
Core strengths
Monetization feature
Charge the industrial power treasure during the trough of electricity consumption, discharge it for equipment during the peak period of electricity consumption, and earn profits through the price difference between the peak electricity consumption.
Emergency power supply function
According to the "Electricity Demand Side Management Measures" signed by the National Grid of the National Grid and the enterprise in accordance with the "Electricity Demand Side Management Measures" of the National Development and Reform Commission, the "Interruption Response Cooperation Agreement" has increased the risk of enterprises pulling power cuts, and the allocation of industrial power treasures can avoid losses caused by power cuts and maintain the necessary operation of enterprises.
Delay capacity expansion
With the increase of power equipment in enterprises, there will be occasional shortage of transformer power, and transformers need to be expanded. Configuring industrial power can reduce the real-time power of transformers, which can help enterprises delay or not expand transformers, and save expansion costs.